After getting the truss finished, my nephew was fighting an allergy bug so we didn't work as the late the past couple of days. I'm exhausted as well. So instead of building some new walls, we just concentrated on demoing the master shower & master toilet walls and the ceiling joists that go over them.
We also demoed out the master shower base, particle board, ¾” & ½” plywood under the old tile, all of the master bathroom, kitchen pantry and kitchen floor. It feels so good to have all of this old flooring out to see that the 2”x6” decking is still in great shape. I was worried that a lot of it would be rotted out from moisture exposure.
View attachment 40908View attachment 40909
View attachment 40907
Every black spot you see was a screw they put into this board. I don't know if the tile guys kid did this or the guy got a new drill...but this shit is nuts.
View attachment 40910